澳门跑跑图新一代,二四六香港码今晚预测三中三,2023新澳历史记录,二四六天下彩天天免费大全,626969免费资料大全查询功能介绍

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

主站蜘蛛池模板: 澳门王中王精准内部资料| 888电影网剧情篇迅雷| 2024新澳门彩4949资料| 觉醒年代电视剧免费观看星辰影院 | 澳门六好彩王中王资料| 澳门资料大全正版资料查询2020正版资料查询| 长歌行电视剧免费观看全集星辰影视| 国内运输的税率| 香港开彩历史开奖记录| 2023澳门资料大全正版新| 香港资料马资料大全| 南柯电影网网址| 新澳彩最新资料| 澳门大三巴朋友圈| 2024年澳门波叔的资料| 物流 货物运输| 香港最准六肖期期准免费资料| 背马鞍的男孩电影免费观看| 2023年澳门开奖结果记录查询最新官网 | 澳门黄大仙资料出来| 英国人在纽约歌曲斯汀| 2020超好玩的网络游戏| 澳门正版资料大全4图库9免费| 2023资料免费大全新奥彩| 深视体育我来斗地主| 全国货运货运信息部| 体育生录取是综合分还是文化分 | 澳门六开全部资料| 62109cσm查询澳彩资料| 澳门鬼谷子高手论坛| 韩国必看犯罪电影| 新澳门免费资料大全精准版| 488588香港开奖记录| 雷军谈周受资离职是当头一棒| 整车运输,零担运输| 平特一肖要怎么买| 澳门跑狗图2024全资料 | 来不及说我爱你免费观看完整版电视剧 | 三期必开一期三期必出特含义| 澳门正版资料34959com| 绝命毒师第二季高清在线观看免费|